Houston Community College System
Procurement Operations
Bids and Request for
Proposals
Download solicitation documents by clicking the corresponding project number.
| Project Number & Name |
Buyer |
Preproposal Conference |
Due Date |
Anticipated Board Action/ |
Dollar Amount |
|
| RFP 11-01 |
Georgia Coats |
October 21, 2010, 1:30pm |
November 8, 2010, 3:00pm |
Barnes & Noble College Book Sellers |
TBD |
|
| IFB 11-02 |
Prudie Lendon |
None |
September 30, 2010, 2:00pm |
Technical Laboratory Systems, Inc. |
$91,973.00 |
|
| RFP 11-03 |
Prudie Lendon |
MANDATORY |
December 10, 2010, 3:00pm |
Evaluation in Progress |
. |
|
| IFB 11-04 |
Wanda Pleasant |
None |
October 5, 2010, 2:00pm |
Hampden Engineering Corporation |
$134,000.00 |
|
| IFB 11-05 |
Georgia Coats |
None |
October 26, 2010, 3:00pm |
Advanced Technologies Consultants, Inc. |
$90,437.00 |
|
| RFQ 11-06 |
Georgia Coats |
None |
October 4, 2010, 2:00pm |
ESPA Corporation |
$3,000,000.00 |
|
| RFP 11-07 |
Pam Ferreira |
NOT MANDATORY |
EXTENDED November 8, 2010, 3:00pm |
Evaluation in Progress |
. |
|
| RFQ 11-08 |
Georgia Coats |
None |
October 7, 2010, 2:00pm |
TLC Engineering, Inc. Maddox Group Broaddus & Associates Aviles Engineering Corp ESPA Corp |
TBD | |
| RFQ 11-09 |
Jeffery Austin |
REVISED |
November 5, 2010, 10:00am |
Cancelled |
. |
|
| RFQ 11-12 |
Prudie Lendon |
None |
November 8, 2010, 2:00pm |
Pending Board Approval |
. |
|
| RFP 11-13 |
Georgia Coats |
None |
November 5, 2010, 3:00pm |
Paul Colbert Consulting |
$50,400.00 |
|
| IFB 11-14 |
Pam Ferreira |
None |
EXTENDED/CHANGED December 15, 2010, 10:00am |
Broadcast Technical Services, Inc. |
$120,003.16 |
|
| RFP 11-15 |
Pam Ferreira |
January 25, 2011, 10:00am |
EXTENDED February 8, 2011, 4:00pm |
Evaluation in Progress |
. |
|
| RFCSP 11-17 | Jeffery Austin |
MANDATORY |
December 7, 2010, 2:00pm |
Horizon Group |
TBD |
|
| RFP 11-18 |
Wanda Pleasant |
December 2, 2010, 10:00am |
December 7, 2010, 3:00pm |
Pending Board Approval |
. |
|
| RFP 11-19 |
Wanda Pleasant |
December 7, 2010, 10:00am |
December 15, 2010, 3:00pm |
Cancelled |
. |
|
| RFP 11-20 |
Shiela Perla |
March 8, 2011, 10:00am |
EXTENDED March 31, 2011, 3:00pm |
. |
. |
|
| IFB 11-22 |
Georgia Coats |
None |
January 20, 2011, 2:00pm |
Cancelled |
. | |
| RFP 11-24 |
Georgia Coats |
February 23, 2011 2:00pm |
Tuesday, March 08, 2011, 2:00pm |
. |
. |
|
| RFQ 11-25 |
Jeffery Austin |
None |
Tuesday, February 22, 2011, 10:00am |
. |
. |
|
| RFCSP 11-26 |
Shiela Perla |
MANDATORY |
Wednesday, March 9, 2011, 2:00pm |
. |
. |
|
| IFB 10-01 |
Pam Ferreira |
None |
September 28, 2009, 3:00pm |
Leica Microsystems |
$91,045.01 |
|
| IFB 10-02 |
Pam Ferreira |
None |
September 29, 2009, 3:00pm |
Lab Resources, Inc. |
95,349.00 |
|
| RFP 10-03 |
Prudie Lendon |
September 18, 2009, 10:00am, 3100 Main, 11th Floor |
October 6, 2009, 2:00pm |
Tribble & Stevens Construction |
$12,996,980.00 |
|
| IFB 10-04 | Georgia Coats |
November 10, 2009, 2:00pm, 3100 Main, 11th Floor |
EXTENDED November 24, 2009, 2:00pm |
Decorative Plants, Inc. |
Estimated $120,412.00 |
|
| RFP 10-05 |
Jeffery Austin |
October 1, 2009 at 10:00am, |
October 19, 2009 at 10:00am |
1) Communication Axess Ability Group 2) Capture-It Unlimited, Inc. |
1) Esimated $2,7 Million 2) Estimated $2.1 Million |
|
| RFP 10-06 |
Georgia Coats |
October 8, 2009 at 2:00pm, |
October 20, 2009 at 2:00pm |
Jamail & Smith Ft. Bend Mechanical Horizon Group |
TBD |
|
| Renee Alonzo |
October 19, 2009 at 10:00am |
November 4, 2009 at 2:00pm |
Higher One |
Not To Exceed $96,754.00 |
||
| RFP 10-08 |
Prudie Lendon |
November 19, 2009, 10:00am, 3100 Main, 11th Floor |
December 1, 2009, 2:00pm |
Cancelled |
. |
|
| IFB 10-09 | Georgia Coats |
None |
December 10, 2009, 2:00pm |
Porter Truck Sales,L.P. |
$75,000.00 |
|
| RFP 10-10 |
Pam Ferreira |
December 2, 2009, 10:00am |
December 9, 2009, 3:00pm |
C & G Wholesale |
TBD |
|
| IFB 10-11 |
Pam Ferreira |
None |
February 1, 2010, 3:00pm |
PerfectForms |
$98,670.00 |
|
| RFP 10-12 |
Pam Ferreira |
April 21, 2010, 10:00am, 3100 Main, 11th Floor |
April 28, 2010, 3:00pm |
Moodlerooms |
$1,068,800.00 |
|
| RFI 10-13 | Georgia Coats |
None |
EXTENDED February 16, 2010, 5:00pm |
Phase I Completed |
N/A |
. |
RFP 10-15 | Georgia Coats |
MANDATORY May 25,2010, 2:00pm, |
EXTENDED June 29, 2010, 3:00pm |
TDIndustries |
TBD | IFB 10-16 |
Jackie Nguyen |
June 4, 2010, 10:00am, |
EXTENDED June 18, 2010, 10:00am |
Tejas Office Products |
$307,826.78 | RFP 10-17 |
Wanda Pleasant |
August 12, 2010, 2:00pm |
EXTENDED August 30, 2010, 10:00am |
Cancelled |
. |
RFP 10-18 |
Shiela Perla |
May 20, 2010, 10:00am, |
June 3, 2010, 3:00pm |
1) VALIC 2) American Century Investments 3) ING Life and Annuity 4) Pentegra Retirement Services 5) TIAA-CREF 6) Fidelity Investments 7) AXA Equitable 8) Security Benefit 8) Aspire Financial Services |
TBD |
RFP 10-20 |
Georgia Coats |
April 15, 2010, 2:00pm, 3100 Main, 11th Floor |
April 22, 2010, 3:00pm |
Ask Reply, Inc. dba B2GNow |
$44,430.00 |
IFB 10-21 |
Shiela Perla |
None |
April 26, 2010, 3:00pm |
Consignrent LLC dba Houston RV Center
|
$95,995.00 |
RFP 10-22 |
Jeffery Austin |
July 2, 2010, 2:00pm |
EXTENDED July 21, 2010, 10:00am |
Choice Enterprise ATM |
Revenue Generating |
RFP 10-23 |
Pam Ferreira |
September 21, 2010, 10:00am |
EXTENDED October 12, 2010, 4:00pm |
Cancelled |
. |
IFB 10-25 |
Jeffery Austin |
None |
June 8, 2010, 10:00am |
Laerdal Medical Corporation |
$173,078.82 |
RFP 10-26 |
Prudie Lendon |
June 28, 2010, 10:00am |
July 8, 2010, 2:00pm |
Giant Video Productions |
$273,900.00 |
IFB 10-27 |
Prudie Lendon |
None |
EXTENDED June 21, 2010, 4:00 pm |
Dentsply |
$66,492.24 |
IFB 10-28 |
Wanda Pleasant |
None |
June 14, 2010, 2:00 pm |
Patterson Dental Supply |
$333,127.00 | RFQ 10-29 |
Georgia Coats |
None |
July 21, 2010, 4:00 pm | Locke Lord Bissell & Liddell Boykins & Schneider, JV | $228,000.00 $228,000.00 |
IFB 10-30 |
Shiela Perla |
None |
EXTENDED July 16, 2010, 3:00pm |
Shimadzu Medical Systems |
$234,850.00 |
RFCSP 10-31 |
Jeffery Austin |
MANDITORY |
EXTENDED August 17, 2010, 2:00pm 3100 Main, 2nd Floor Seminar Room A |
Tribble & Stephens |
$7,262,398.00 |
. | RFP 10-32 |
Shiela Perla |
September 9, 2010, 2:00pm |
EXTENDED INDEFINITELY |
. |
. |
RFP 10-33 |
Prudie Lendon |
None |
August 6, 2010, 2:00pm |
Matrix Consulting Group |
$29,500.00 |
. |
IFB 10-34 |
Jeffery Austin |
none |
August 17, 2010, 10:00am |
UMEDIC |
$68,000.00 |
. |
RFP 10-36 |
Wanda Pleasant |
September 20, 2010, 11:00am |
September 30, 2010, 3:00pm |
. |
. |
IFB 09-01 |
Mara Glover |
October 10, 2008, 10:00am, |
October 17, 2008, 2:00pm |
Ozarka |
$5,927.04 |
RFP 09-03 |
Renee Alonzo |
October 7, 2008, 2:00pm, |
October 28, 2008, 3:00pm |
E
& W Diversified Services |
$208,000 |
RFP 09-04 |
Georgia Coats |
October 15, 2008, 2:00pm, |
November 13, 2008, 4:00pm |
RHJ-JOC Kellogg, Brown & Root Ft. Bend Mechanical |
TBD |
IFB 09-05 |
Renee Alonzo |
none November 17, 2008, 3:00pm |
Pier-Tech,
Inc. |
$42,590.00 |
RFQ 09-06 |
Georgia Coats |
none February 12, 2009, 4:00pm |
Archi*Technics/3,
Inc. |
TBD |
IFB 09-07 |
Mara Glover |
none |
May 22, 2009, 2:00pm |
Jay's
Beverage |
$29,646.18 |
IFB 09-08 |
Georgia Coats |
none |
EXTENDED October 30, 2008, 2:00pm |
Stryker
Medical |
$154,635 |
|
Pam Ferriera |
November 26, 2008, 10:00am, 3100 Main, Room 11A07 |
December 3, 2008, 2:00pm |
Netsync
Network Solutions |
$7,828,944 |
RFP 09-10 |
John Carter |
none |
November 24, 2008, 3:00pm |
Wheless
Associates |
$49,500 |
|
Renee Alonzo |
February 3, 2009, 10:00am |
February 19, 2009, 3:00pm |
Southwest Credit System |
TBD |
IFB 09-12 |
Georgia Coats |
none |
December 16, 2008, 2:00pm |
Southwest
Sewing Machines Co. |
$26,760.00 |
RFP 09-13 |
Georgia Coats |
January 28, 2009, 2:00pm |
Extended Indefinitely |
Cancelled |
. |
RFP 09-14 |
John Carter |
none |
December 15, 2008, 3:00pm |
WB
& Associates |
$47,500.00 |
IFB 09-15 |
Prudie Lendon |
none |
February 10, 2009, 2:00pm |
Cancelled.
This project will be rebidded. |
. |
IFB 09-16 |
Prudie Lendon |
none |
February 17, 2009, 3:00pm |
Award-ThreadMill
Industrial Supply, Inc |
$28,242.48 |
IFB 09-17 |
Pam Ferriera |
none |
January 26, 2009, 3:00pm |
Teaching
Systems, Inc. |
$45,860.00 |
IFB 09-18 |
Pam Ferriera |
none |
January 26, 2009, 4:00pm |
Technical
Laboratories |
$45,315.00 |
IFB 09-19 |
Pam Ferriera |
none |
April 13, 2009, 4:00pm |
Stan
Bio Laboratory |
$48,450.00 |
RFP 09-20 |
Pam Ferriera |
February 12, 2009, 10:00am |
February 18, 2009, 4:00pm |
Yaffe/Deutser |
$47,500
monthly |
RFQ 09-22 |
Georgia Coats |
none |
February 13, 2009, 4:00pm |
Espa
Corporation |
TBD |
IFB 09-23 |
Prudie Lendon |
none |
April 8, 2009, 2:00 p.m. |
Cancelled |
. |
IFB 09-25 |
Jeff Austin |
none |
March 31, 2009, 3:00pm |
Gaumard Scientific Company |
$71,833.36 |
IFB 09-26 |
Prudie
Lendon |
none |
April 17, 2009, 2:00pm |
Physician
Sales & Service |
$23,999.85 |
IFB 09-27 |
Pam Ferriera |
none |
April 13, 2009, 3:00pm |
Crimestar
Corporation |
$32,500.00 |
IFB 09-29 |
Georgia Coats |
none |
May 13, 2009, 2:00pm |
Agilent Technologies, Inc. |
$86,895.79 |
RFP 09-30 |
Georgia Coats |
none |
May 6, 2009, 2:00pm |
Worksite Health Solutions |
$18,750.00 |
RFP 09-31 |
Georgia Coats |
April 27, 2009, 2:00pm, |
May 12, 2009, 2:00pm |
Cancelled |
. RFQ 09-32 Georgia Coats May 5, 2009, 10:00AM, May
13, 2009 2:00pm Chevron
Energy Solutions $4,900,000 |
IFB 09-33 |
Pam Ferreira |
none |
May
13, 2009, 4:00pm |
G
E Healthcare |
$55,500.00 |
IFB 09-34 |
Prudie Lendon |
none |
May
29, 2009, 2:00pm |
VSA, Inc. |
$87,892.00 |
IFB 09-35 |
Prudie Lendon |
MANDATORY May 19,
2009, 10:00am, |
May
27, 2009, 2:00pm |
GE Healthcare |
$101,000.00 |
RFP 09-36 |
Jeffery Austin |
May 22,
2009, 10:00am, |
EXTENDED June 8, 2009, 10:00am |
J's Quality Construction |
Est. $1,500,000 |
RFQ 09-37 |
Renee Byas |
none |
June
5 , 2009, 2:00pm |
Bracewell & Giuliani, LLP Feldman & Rogers LLP Karczewski Bradshaw LLP Littler Mendelson PC Monty Partners LLC Strasburger & Price LLP |
TBD |
IFB 09-38 |
Michael Groesch |
none |
June
16, 2009, 2:00pm |
Electric & Automation of TX-US |
$65,878.24 |
IFB 09-39 |
Jeffrey Austin |
none |
EXTENDED July 6, 2009, 10:00am |
Patterson Dental Company |
$253,374.00 |
RFP 09-40 |
Jeffery Austin |
July
6, 2009, 2:00pm, |
July 29, 2009, 2:00pm |
Premier IMS, Inc. |
$90,000.00 IFB 09-41 Supply, Deliver (F.O.B. Destination) and Install Five (5) Programmable Automation Control (PAC) Systems amendment 1 |
Jeffery Austin July
20, 2009, 10:00am, July 30,2009, 10:00am |
Cancelled |
.
| |
Prudie Lendon MANDATORY July
27, 2009, 10:00am, Aug 4, 2009, 2:00pm |
Cancelled |
. IFB 09-43 Supply, Deliver (F.O.B. Destination) and Set-Up One (1) New Baldwin L1-HPE 6'3" Artist Grand Piano with Artist Bench |
Jeffery Austin none August 7, 2009, 10:00am |
Fort Bend Music Center |
$24,598.38
|
IFB 09-44 |
Michael Groesch |
none |
July 14, 2009, 2:00pm |
Organic Motion, Inc. |
$49,500.00
|
IFB 09-45 |
Michael Groesch |
none |
July 22, 2009, 2:00pm |
Keyence Corporation of America |
$43,000.00 | RFP 09-46 |
Michael Groesch |
July
10, 2009, 2:00pm,
|
Extended Indefinitely |
Cancelled |
.
| Pam Ferreira none Aug 10, 2009, 3:00pm |
Cancelled |
. RFCSP 09-48 Jeffery Austin August 31, 2009 @ 10:00 a.m., 3100 Main, 11th Floor September 15, 2009, 2:00pm Gamma Construction $900,000.00 Jeffery Austin July
27, 2009, 10:00am, 3100 Main Street (11th) Floor, Room 11A07 Aug 3, 2009, 10:00am R.E. Mitchell, LLC dba Fish Window Cleaning $172,114.00 Georgia Coats July
24, 2009, 10:00am, 3100 Main Street (11th) Floor, Room 11A07 Aug 4, 2009, 2:00pm |
Cancelled |
Michael Groesch none August 7, 2009, 2:00pm BIO Landscape & Maintenance Inc. $432,324.00 IFB 09-53
Dress Forms Mara Glover none September 16, 2009, 2:00pm |
Cancelled |
. Michael Groesch August 26, 2009, 10:00am, 3100 Main Street (11th) Floor, Room 11A07 September 8, 2009, 2:00pm The French Corner Catering Revenue Generating Georgia Coats | MANDATORY September 3, 2009, 2:00pm, September 22, 2009, 2:00pm Miner Dederick Construction, LLP $1,200,000.00 IFB 09-57 Prudie Lendon September 11, 2009 @ 10:00am, September 18, 2009, 2:00pm Sprint Waste Services $177,132.00 RFCSP 09-58 Jeffery Austin MANDATORY September 17, 2009 @ 2:00pm, 6815 Rustic Street, Room 1005 |
EXTENDED October 1, 2009 @ 2:00pm, 3100 Main, 11th Floor (11A06) Durotech $3,744,200.00 |
IFB 08-01 |
Pam Ferreira |
none |
September 24, 2007, 3:00pm |
Moore
Medical |
$26,919.23 |
IFB 08-02 |
Pam Ferreira |
NOT MANDATORY October 11, 2007, 10:00am,3100 Main, 11th Floor |
EXTENDED
October 19, 2007, 3:00pm |
Netsync
Network Solutions |
$932,326.80 |
IFB 08-04 |
Renee Alonzo |
none |
November 20, 2007, 3:30pm |
Keyence
Corporation of America |
$57,388.67 |
IFB 08-05 |
Denise McGuire |
none |
November 26 , 2007, 3:00pm |
Hampden
Engineering |
$32,203.00 |
IFB 08-06 |
Renee Alonzo |
none |
November 28 , 2007, 3:30pm |
Pasco
Scientific |
$39,364.20 |
IFB 08-07 |
Renee Alonzo |
none |
November 29 , 2007, 3:30pm |
ADInstruments |
$39,000.00 |
RFP 08-08 |
Prudie Lendon |
January 4, 2008, 10:00am, |
January 17, 2008, 3:00pm |
Executive
Vending |
Revenue
Generating |
RFQ 08-09 |
Prudie Lendon |
none |
April 21, 2007, 4:00pm |
Gainer,
Donnelly & Desroches |
Hourly
Billing Rates |
IFB 08-10 |
Keith Reynolds |
none |
EXTENDED |
MicroLab,
Inc. |
$30,626.83 |
RFP 08-11 |
Pam Ferreira |
January 9, 2008, 10:00am, |
January 16, 2008, 4:00pm |
The
Spearhead Group |
$476,160.00 |
IFB 08-12 |
Pam Ferreira |
January 7, 2008, 10:00am, |
January
14, 2008, 4:00pm |
Cancelled |
. |
IFB 08-13 |
Keith Reynolds |
none |
March 17, 2008, 3:30pm |
Cancelled |
. |
RFP 08-15 |
Prudie Lendon |
January 31, 2008, 2:00pm, |
February 27, 2008, 4:00pm |
University
of Texas HSC |
$60,848.00 |
RFP 08-19 |
John Carter |
MANDATORY |
EXTENDED October 31, 2008, 4:00pm |
ABM
Janitorial Services |
$3,812,632 |
IFB 08-21 |
Prudie Lendon |
August 22, 2008, 2:00pm, |
August 29, 2008, 3:00pm |
A-Rocket
Moving Services |
$77,720.00 |
IFB 08-22 |
Renee Alonzo |
July 22, 2008, 2:00pm, 3100 Main, 11th Floor |
August 8, 2008, 3:00pm |
Right Now Termite and Pest Control |
$12,966.20 |
RFQ 08-26 |
Georgia Coats |
none |
May 5, 2008, 4:00pm |
|
$108.000 $108.000 $48,000 |
|
John Carter |
none |
June 18, 2008, 4:30pm |
Texas General Land Office/Reliant Energy Solutions |
To
Be Determined |
IFB 08-30 |
Jackie Nguyen |
June
30, 2008, 10:00am, |
July 7, 2008, 10:00am |
Reliant Business Products |
$259,734 |
IFB 08-32 |
Pam Ferreira |
March 26, 2008, 10:00am, |
April 2, 2008, 4:00pm |
Troubadour |
$2,015,418.90 |
IFB 08-33 |
Georgia Coats |
none |
May 6, 2008, 3:00pm |
KRATOS |
$206,419.00 |
IFB 08-35 |
Pam Ferreira |
none |
May 27, 2008, 4:00pm |
Houston
Piano Company |
$24,500.00 |
IFB 08-36 |
Renee Alonzo |
none |
June 2, 2008, 3:00pm |
Hampden
Engineering |
$88,711.00 |
RFP 08-37 |
Pam Ferreira |
MANDATORY |
June 2, 2008, 4:00pm |
Troubadour
Inc. |
$949,193.20 |
IFB08-38 |
Renee Alonzo |
none |
July 15, 2008, 3:00pm |
Pasco
Scientific |
$21,972.00 |
IFB 08-39 |
Prudie Lendon |
none |
August 22, 2008, 2:00pm |
Fireblast
451, Inc. |
$49,940.00 |
IFB 08-40 |
Pam Ferriera |
none |
July 28, 2008, 3:00pm |
Troubadour,
Inc. |
$48,791.50 |
IFB 08-41 |
Georgia Coats |
MANDATORY |
August 7, 2008, 4:00pm |
Dunbar
Armored, Inc. |
$92,292.00 |
IFB 08-42 |
Georgia Coats |
none |
August 19, 2008, 4:00pm |
Multimedia
Learning Systems |
$96,012.00 |
IFB 08-43 |
Renee Alonzo |
none |
EXTENDED September 30, 2008, 3:00pm |
Keyence Corp. |
$73,327.69 |
RFP 08-45 |
Pam Ferreira |
September 5, 2008, 10:00am, 3100 Main, 11th Floor |
EXTENDED September 29, 2008, 4:00pm |
Technical
Services The Spearhead Group Precision Task Group TEK Services Spherion Corporation Staffing Connection, Inc. Administrative Services Executeam Staffing
|
Fixed Hourly Rates |
IFB 08-47 |
Prudie Lendon |
none |
September 30, 2008, 2:00pm |
Biopac
Systems, Inc. |
$35,955.00 |
IFB 07-01 |
Karen Warren |
October 10,
2006, 2:00pm, |
October 24, 2006, 2:00pm |
Southern Tire Mart |
$39,783.00 |
IFB
q07-02 |
Karen Warren |
q |
October 9, 2006, 2:00pm |
Autodesk |
$27,500.00 |
RFP
07-03 |
Pam Ferreira |
October 9, 2006, 10:00am |
October 31, 2006, 4:00pm |
A T & T Phonoscope |
$456,276 $92,400 . |
IFB
07-04 |
Georgia Coats |
none |
October 17, 2006, 3:00pm |
Buoy Services, dba Survival
Air Systems |
$62,501.00 |
RFP
07-06 |
Georgia Coats |
none |
EXTENDED to January 5, 2007, 4:00pm |
Cancelled |
. |
RFP
07-08 |
Denise McGuire |
February 20, 2007, 1:00pm |
EXTENDED March 5, 2007, 4:00pm |
Cancelled |
. |
RFP
07-11 |
Rodney Heath |
February 27, 2007, 2:00pm |
March 19, 2007, 4:00pm |
Cancelled |
. |
RFP
07-12 |
Denise McGuire |
January 4,
2007, 2:00pm |
January 11, 2007, 4:00pm |
Cancelled |
. |
RFP
07-14 |
Georgia Coats |
March 20,
2007, 2:00pm |
March 29, 2007, 4:00pm |
Cancelled |
. |
RFCSP
07-15 |
Rodney Heath |
MANDATORY
|
February 26, 2007, @2:00pm, room#11A06, 3100 Main St. (11th Floor)
Houston, TX 77002 |
Satterfield and Pontikes Construction, Inc. |
$5,599,000
| |
Rodney Heath |
May 3 , 2007,
2:00pm, |
May 18, 2007, 4:00pm |
Andrews Auction and Realty Service |
Commission-based |
IFB
07-19 |
Pam Ferreira |
April l0,
2007, 10:00am, |
April 23, 2007, 2:00pm |
Martin Preferred Foods LaBatt Food Service Great Southwest Paper Co. |
$89,624.00 $74,065.00 $36,926.00 |
RFP
07-20 |
Pam Ferreira |
April 10,
2007, 2:00pm, |
April 27, 2007, 4:00pm |
A T & T |
$1,924,458.00 |
IFB
07-21 |
Pam Ferreira |
none |
May 16, 2007, 2:00pm |
Cancelled |
. |
IFB
07-22 |
Renee Alonzo |
none |
May 24, 2007, 3:00pm |
Ross Video |
$37,668.30 |
RFP
07-23 |
Denise McGuire |
June 6, 2007, 10:00am |
June 21, 2007, 3:00pm |
Giant Video Productions |
Hourly Rates Based on Job Description |
RFP
07-26 |
Rodney Heath |
May 23, 2007,
2:00pm, |
June 14, 2007, 4:00pm |
Cashnet |
$142,612 |
IFB
07-27 |
Pam Ferriera |
none |
June 27, 2007, 3:00pm |
Keyence Corp. |
$73,233.86 |
|
Georgia Coats |
June 19, 2007, 2:00pm |
July 10, 2007, 4:00pm |
Cancelled |
. |
IFB
07-31 |
Rodney Heath |
none |
May 30, 2007, 4:00pm |
Product Development, Inc. |
$26,459.83 |
RFP
07-32 |
Georgia Coats |
June 5, 2007, 2:00pm |
June 20, 2007, 4:00pm |
AFC Corporate Transportation Huerta Bus Services Ponce Bus Services Sanders Charters and Tours, Inc. |
$20,000.00 $20,000.00 $20,000.00 $15,000.00 |
IFB
07-33 |
Georgia Coats |
July 17, 2007, 10:00am |
July 26, 2007, 10:00am |
Dunbar Armored |
$76,902.00 |
RFP
07-34 |
Keith Reynolds |
July 3, 2007, 10:00am |
July 17, 2007, 4:00pm |
American LaFrance |
$524,585.00 |
RFP
07-40 |
Michael Kyme |
June 28,
2007, 10:00am, |
July 16, 2007, 2:00pm |
Legacy CMS Group Limited Chevron Energy Solutions |
TBD |
06-01 |
Rodney Heath |
none |
Sept. 26, 2005, 3:00pm |
WT.Cox Subscriptions, Inc. |
$65,248.92 |
06-02 |
Georgia Coats |
October 19,
2005, 2:00pm |
October 25, 2005, 4:00pm |
Ad Astra Information Systems |
$127,500.00 |
06-03 |
John Carter |
Oct. 19,
2005, 10:00am |
Extended until November 18, 2005, 4:00pm |
Cancelled |
. |
|
Michael Kyme |
none |
November 3, 2005, 3:00pm |
GLOReliant/Choice |
TBD |
06-05 |
Pam Ferreira |
February
17, 2006, 3:00pm |
March 10, 2006, 4:00pm |
Tek Systems |
Hourly Rates Based on Job Description. |
06-07 |
Renee Alonzo |
August 15,
2006, 11:00am, |
August 28, 2006, 4:00pm, 3100 Main, Room 11A07 |
Academy Awards Buffalo Specialties The Augusta Group Jack Nadel, International |
$46,054.37 $161,686.62 $16,537.84 $59,276.46 |
06-09 |
Denise McGuire |
none |
January 6, 2006, 3:00pm |
Laerdal Medical Corporation. |
$145,486.00 |
06-10 |
Rodney Heath |
March 21,
2006 10:00am |
March 29, 2006, 3:00pm |
Michaeline's Catering |
Revenue Generating |
06-11 |
Georgia Coats |
May 30 ,
2006 2:00pm |
June 26, 2006, 4:00pm |
Sherrarium Company |
$44,454 |
06-12 |
Rodney Heath |
February
3, 2006 10:00am |
February 9, 2006, 3:00pm |
Sunnen Products Company |
$49,995.00 |
06-13 |
Karen Warren |
March 8 ,
2006 2:00pm |
April 10, 2006, 3:00pm |
Communication Axess Ability Group Capture-It Unlimited |
$730,000 |
06-14 |
Denise McGuire |
none |
February 14, 2006, 3:00pm |
VXS Imaging |
$52,400 |
06-15 |
Georgia Coats |
April 11,
2006 2:00pm |
April 27, 2006, 4:00pm |
Cancelled |
. |
06-16 |
Rodney Heath |
none |
March 9, 2006 3:00pm |
Vicon Motion Camera Systems, Inc. |
$124,070 |
06-17 |
Karen Warren |
June 27,
2006 2:00pm, |
Please Note: See Amendment No. 2 and the Q and A. The due date has been extended to September 5, 2006, 3:00pm. |
Mail Services of Houston International Mailing Systems, Inc. |
Price Schedule Based on Quantity |
06-18 |
Denise McGuire |
Sept. 12,
2006 2:00pm, |
Proposal Submission Extended to October 5, 2006, 2:00pm |
International Mailing Systems, Inc. National Mail Advertising Inc. |
Price Schedule Based on Hourly Services and Quantity |
06-21 |
Michael Kyme |
April 13,
11:00am, |
Please note: The due date has been extended to 4/26/06 at 2pm. |
CampusWorks, Inc. |
$2,344,762 |
06-22 |
Jack Cutting |
none |
March 24, 2006, 2:00pm |
Cancelled |
. |
06-23 |
John Carter |
none |
April 3, 2006 3:00pm |
HOK Architects |
$1,085,500 |
|
John Carter |
none |
May 4 , 2006 4:00pm |
Gilbane Building Company |
$29,977,602 |
06-25 |
Georgia Coats |
none |
April 26, 2006 4:00pm |
Esco Biotech, Inc. |
$14,219.90 |
06-26 |
Michael Kyme |
none |
April 6, 2006 2:00pm |
Llewelyn-Davis Shani |
TBD |
06-27 |
Rodney Heath |
none |
July 19, 2006 3:00pm |
Ruan Truck Sales |
$126,000 |
06-31 |
Jack Cutting |
May 11, 2006
11:00am |
May 30, 2006 4:00pm |
Cancelled |
. |
06-32 |
Rodney Heath |
MANDATORY |
August 18, 2006 4:00pm |
Cancelled |
. |
06-34 |
Rodney Heath |
MANDATORY |
August 25, 2006 4:00pm |
Von Younger Landscaping |
$445,620 |
06-35 |
Denise McGuire |
MANDATORY |
September 12, 2006 3:00pm |
Bank of America J.P. Morgan Chase Bank |
$53,417 no specified dollar amount |
06-36 |
Pam Ferreira |
|
July 17, 2006 4:00pm |
Cancelled |
. |
06-37 |
Michael Kyme |
none |
September 7, 2006, 2:00pm |
ACCT |
$50,000 |