Solicitations under evaluation

Below are solicitations that were previously advertised and the solicitation due date has officially closed. The projects listed have not yet been finalized and may be in various stages of the procurement process. Please contact the noted Buyer responsible for the respective solicitation with any specific questions as to the status of the procurement. If no bids are displayed then none are currently under evaluation.

IFB 17-02 LED Lighting Retrofit Admin Bldg (Loanstar#1)

Due: Sep 14, 2016

Status: Evaluation in Progress


IFB 17-03 LED Lighting Retrofit (Loanstar#1) (Multi-Campuses)

Due: Sep 20, 2016

Status: Evaluation in Progress


IFB 17-06 AHU-VFD (HVAC) and Control System Replacement Admin Bldg (Loanstar#1)

Due: Sep 15, 2016

Status: Evaluation in Progress


IFB 17-07 HVAC System Replacement and Renovation West Loop Campus (Loanstar#1)

Due: Sep 26, 2016

Status: Evaluation in Progress


IFB 17-08 Chiller Replacement Project 2016 Stafford Fine Arts Bldg. (Loanstar#1)

Due: Sep 22, 2016

Status: Evaluation in Progress


RFP 16-16 Structured Cabling Services

Due: Aug 9, 2016

Status: Evaluation in Progress


RFP 16-38 Bank Depository Services

Due: Aug 5, 2016

Status: Evaluation in Progress


RFP 16-39 Truck Driving Simulation System

Due: Jul 25, 2016

Status: Evaluation in Progress


RFP 17-04 Geology Laboratory Equipment Petroleum Engineering Technology

Due: Sep 1, 2016

Status: Evaluation in Progress


RFP 17-05 Submersible Pump System Petroleum Engineering Technology

Due: Sep 1, 2016

Status: Evaluation in Progress



Page:  1 2 > >>

Note

The projects noted above are currently under the Prohibited Communications and Political Contributions, commonly known as the Blackout Period. For upcoming solicitations, please visit the 2015 Procurement Plan.